Current infrastructure projects IPO allocation today; GMP Robust after 370x subscription. Check the status, GMP

Current infrastructure projects IPO allocation today; GMP Robust after 370x subscription. Check the status, GMP

The allocation of shares for RS 41.80 Crore IPO of current infrastructure projects is announced today. Investors who have applied for the issue opened from August 26 to August 29, can soon check whether they have received shares. The EPC and Renewable Energy Solutions company has been set to mention on 3 September 2025 on the NSE SME platform.

Current infrastructure projects GMP

In the gray market, shares of current infrastructure projects are traded with a premium of 51% compared to the issue price. This suggests a possible list around RS 120–122 per share, although the final result will depend on the market sentiment on the list day.

How to check the IPO allocation

Investors can check their allocation status online using PAN, Application Number or DP/Client ID. The details are available on the registrar and exchange websites:

  1. Registrar (Bigshare Services): https://ipo.bigshareonline.com/ipo_status.html
    • Visit Bigshare -Services
    • Select Company name
    • Enter a pan or application number
  2. BSE IPO allocation: https://www.bseindia.com/investors/appli_check.aspx
    • Select Equity and company name
    • Enter the application number

Refunds for Non-Allottees will be processed on 2 September and successful investors will be credited to their DEMAT accounts on the same day.

Robust subscription

The IPO received an overwhelming response and was generally subscribed to 370 times. The shopping area was subscribed 396.50 times, while the Non-Initutional Investors (NII) segment saw a huge question with a subscription of 640.48 times. The category qualified institutional buyer (QIB) was subscribed 191.77 times. Ahead of the Issue, the current infrastructure projects, RS increased 11.62 crore from Anker investors from Anker investors on 25 August by allocating 14.52 Lakh shares.

IPO yield

The IPO proceeds will be used to invest in his subsidiary for setting up a 1,800 KW Zonnefabriek at IIT (ISM) Dhanbad, Financing working capital needs and cover general business purposes.

About the company

Current infrapprojects is an EPC (engineering, purchasing and construction) player who specializes in solar, electric, water and civilian projects. It also offers project management advice and mechanical, electric and sanitary (MEP) engineering solutions.

The company is active in 12 states in India and has completed projects worth RS 232 Crore from July 31, 2025. It also diversifies in hospitality services through a rented property, Yahvi de Boerderij.

Financial performance

For FY25, the current infrastructure projects reported the turnover of RS 91.33 Crore and profit after tax on RS 9.45 Crore. EBITDA was on RS 14.75 Crore with margins of 16.23%.

Prospect

With a GMP of 51% and a strong subscription numbers, the current list of current infrastructure projects will be positive on 3 September.

((Indemnification: Recommendations, suggestions, views and opinions of the experts are their own. These do not represent the views of economic times)

Add And logo as a reliable and trusted news source

#Current #infrastructure #projects #IPO #allocation #today #GMP #Robust #370x #subscription #Check #status #GMP

Similar Posts

Leave a Reply

Your email address will not be published. Required fields are marked *